Dry Hydrant Water Delivery System
*Current lead times are 6-8 weeks for all Dry Hydrant Water Delivery Systems*
We have all the complex elements needed for a fire department to construct a dry hydrant water system at an affordable price. Each dry hydrant kit is complete with a 6" Schedule 40 PVC elbow with a threaded adapter attached by glue, cone shaped suction strainer, snap ring and aluminum cap or plug. The underwater strainer and support clamp are sold separately.
The underground PVC and elbow are not included. These can be found locally so you save money on shipping charges. The underwater strainer is designed with 1190 3/8" holes for maximum flow and features a back flushing cover which allows for easy removal of debris.
Strength, lightweight, 6061-T6 aluminum alloy and have lugs with holes for rope connection. Baskets are 1/4" x 1/4" square zinc-plated steel mesh for high capacity intake.